Go Back   Hardware Canucks > PC BUILDERS & TWEAKERS CORNER > New Builds

       
Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old September 9, 2009, 11:30 PM
Rookie
 
Join Date: Sep 2009
Posts: 3
Default Gaming Rig -Need help fast so I can change order if needed!

I just placed an order for the following computer but it's not too late to change something if I made a horrible choice. Really two areas worry me (video card and monitor). The rest I am comfortable with:

CPU - Intel Core i5 750
MB - Gigabyte P55-UD4P ATX LGA1156 P55
Case - Cooler Master Haf 932 Full Tower Black EATX Case
HD - Western Digital WD1001FALS Caviar Black 1TB
Ram - 2x G.SKILL F3-16000CL9D-4GBRH Ripjaws PC3-16000 4GB 2X2GB (8gb total)
PSU - Corsair Professional HX850W 850W ATX

Monitor- Philips Brilliance 240PW9EB 24IN IPS

The monitor scares me a bit since there are few reviews on it and some questions about quality. There wasn't much I like at 24 inches for gaming and it came down to this and the Acer G24 (another monitor that has few reviews). I really like the glossy screen of the Acer G24 in the store but not so sure the glare won't bother me at home (I still use a CRT at home since I haven't been a fan of LCDs to date).
I can get the Acer G24 locally for the same price. The Phillips is being sent across country so if I hate it I am kind of out of luck. Would you risk it considering this is an IPS panel?

Video Cards - 2x ASUS Radeon 4870 Dk 750MHZ 1GB 3.6GHZ

Decided to go with the 4870s crossfired versus a 4890. It cost $80 more to have both for the increase in performance I get. Some are suggesting I go with the 4890 and buy a second later when the price drops but it will be hard to justify that later when even newer cards are out and I'm probably better off just buying a whole new card! At least that's my theory. This way I get the full goodness of the two cards to enjoy for now and can upgrade later anyway.

The sound card, mouse etc. are all being pulled from my current computer so don't worry about those.

So please let me know your opinions on my monitor dilemma (remember this is a gaming rig primarily though I do use it for other things) and if my reasoning is sound for the vid cards (or at least good enough that it's not worth changing).

Thanks in advance!
Reply With Quote
  #2 (permalink)  
Old September 9, 2009, 11:33 PM
enaberif's Avatar
Hall Of Fame
 
Join Date: Dec 2006
Location: Calgahree, AB
Posts: 9,705
Default

Won't say much about the system as it looks good but I'll say this about the monitor.

I had a buddy order a HP monitor from back east and I was like I hope you got a warranty or coverage for that as it'd suck to come this way and have a dead pixel or two.

Well he got it, opened it and guess what... 3 dead pixels.
Reply With Quote
  #3 (permalink)  
Old September 9, 2009, 11:44 PM
Rookie
 
Join Date: Sep 2009
Posts: 3
Default

I forgot to get the dead pixel warranty originally but I sent an email immediately after and I'm sure they will add it on before sending. The order is still in processing so I will be ok....
Reply With Quote
  #4 (permalink)  
Old September 10, 2009, 04:25 AM
martin_metal_88's Avatar
Hall Of Fame
F@H
 
Join Date: Apr 2009
Location: Quebec City
Posts: 4,175

My System Specs

Default

Build seems solid my friend enjoy it, post on workblog! that's an obligation:P and give us result about the core I5:P

ask for more.
__________________
Ask for more

Martin_metal_88
Colenzo : See system spec!

Odysseus : I7 860 @ 3.6Ghz || GA P55-UD5 || G.skill Ripjaws F3-16000 2000Mhz 2X2GB || Coolermaster ATCS 840 || Silverstone Strider plus 850W || WD 640 black - WD 1TB green - Samsung F3 2TB || MSI 5670 1GB Cyclone ||Coolermaster Hyper 212 + ||

Reply With Quote
  #5 (permalink)  
Old September 10, 2009, 04:58 AM
Hall Of Fame
F@H
 
Join Date: Oct 2008
Location: Ottawa
Posts: 2,021
Default

Buddy has that same monitor and it looks great. You should be fine.
Reply With Quote
  #6 (permalink)  
Old September 10, 2009, 07:15 AM
Full Speed's Avatar
Allstar
 
Join Date: Jul 2009
Location: Mount Pearl, Newfoundland
Posts: 805

My System Specs

Default

I'm looking at doing a build with the same CPU, motherboard, case, and HDD. Let us know how it turns out.
Reply With Quote
  #7 (permalink)  
Old September 10, 2009, 08:26 AM
lcdguy's Avatar
Hall Of Fame
F@H
 
Join Date: Mar 2007
Location: An undisclosed location
Posts: 2,044
Default

Philips monitors are pretty good. I have one at home it's starting to go after about 7 years. The only issues now was it had one blue pixel when i bought it but i was cool with it. and i think the vga cable is starting to go (does the freaky disco color change). as for adding the dead pixel policy i would call them or request a call back as their turn around time maybe after your order has been processed.
__________________
and now for something completely different

Reply With Quote
  #8 (permalink)  
Old September 21, 2009, 07:33 AM
Rookie
 
Join Date: Sep 2009
Posts: 3
Default

Thanks to everyone that helped.

This computer is amazing so far! Everything I hoped for, no issues.
Reply With Quote
  #9 (permalink)  
Old September 21, 2009, 07:39 AM
Prof. Dr. Silver's Avatar
Hall Of Fame
F@H
 
Join Date: Nov 2007
Location: Toronto, ON
Posts: 1,187
Default

Pictures or it didn't happen!
__________________
Hardcore Folding at it's BEST! HWC - TPU.... There can be only one team in front! TPU, can you smell our *sses already?
Reply With Quote
Reply


Thread Tools
Display Modes

Similar Threads
Thread Thread Starter Forum Replies Last Post
FS: New Gaming Rig kruzn4evr Buy/Sell & Trade 17 October 28, 2009 08:31 PM
New Gaming Rig Formaldehyde New Builds 20 October 26, 2008 08:50 PM
First Gaming Rig crazysundog New Builds 28 September 29, 2008 10:06 PM
New Gaming Rig calvincheng14 New Builds 12 July 2, 2008 09:08 PM
New Gaming Rig? mgp141 CPU's and Motherboards 16 December 28, 2007 06:30 PM