Quote:
Originally Posted by klaiboi how much does the pump pull? the monitoring PC shouldn't draw much and iirc your not running SLI for the main rig  |
Quote:
Originally Posted by Wall86 It should run off of a double pull easily. Most power supplies do accept 240V as well. If you do not need your dryer for a little while, just disconnect it to make way for the thinktank :) |
Here's the numbers ;
The coolant pump is 2.2 amps....The Vacuum pump is 3.5 amps...Lets' call the monitoring computer 200 watts....so 2 amps lets say.....The thinktank rig might be 300Watts at first.....so lets say 3 A......
Thats basically 11 amps , so technically , one circuit would do it.Like I say , it's no more of a power hog than the thinktank 1.
I'm doing 2 phase to separate the 'motor starts' from the 'processors'.....