nope havn't gptten the 32 sharp yet lol but its in the works Paul lol i think here in about 3 weeks i am gonna order the second card and the water blocks with the pumps and get those all cooled :)
then work on the 32 sharp :)
Lol man this thing is so nice !!!!!
|