Thread: Estimated TPF
View Single Post
  #3 (permalink)  
Old February 10, 2013, 01:19 PM
Hooded's Avatar
Hooded Hooded is offline
Top Prospect
F@H
 
Join Date: Dec 2012
Location: Bowmanville,Ontario
Posts: 166

My System Specs

Default

Sorry but I don't understand your explanation.

I thought it was something like Estimated Time for Protein to Fold

After doing a fair bit log looking around the App. It seems to me that the Estimated TPF is equal to the time it takes to fold 1% of the project. When I check my log for a project and do the math between the time between steps it pretty much exactly matches the Estimated TPF.

So I still don't know what exactly the TPF is short for I do at least now get an idea of what it represents.
__________________
Reply With Quote