Thread: Work in progress Operation : Big UPS/solar backbone.
View Single Post
  #36 (permalink)  
Old August 16, 2012, 05:49 PM
BrainEater's Avatar
BrainEater BrainEater is offline
Hall Of Fame
 
Join Date: Mar 2007
Location: Calgary
Posts: 2,502
Default

Quote:
Originally Posted by enaberif View Post
I will have a metal cabinet in the next day or two going to scrap. I can get you dimensions tonight.
No worries......I gave away 3 metal cabinets in the last month.I still have 2 lawl....

The UPS stack is actually on a custom made rolling 'tray'......1.5 inch thick laminated plywood......4x 250 pound wheels...It's holding the 400+ pounds no problem, and wheels around fairly easily.

-----

I did some work on the 220v side today.Looks like Imma have to clean up the whole on side of my breaker box.....whoever wired it did a terrible job.

I've also priced out the metering I want : simpson type 157 meters : 500$

eeeeesh.

I'll post the small pic from above again ;


----

__________________
Intel 3930k /rIVe/32 Gb vengeance LP/Nvidia TITAN/760/760/Intel 520's/WD raptors/etc...
Reply With Quote