Quote:
Originally Posted by MARSTG ok, so i am trying some linux folding right now, never operated linux in my life but I am following some guides and says that i picked up a 6884 project that has 14 days preferred deadline. I have a Ph II @3.2GHz. Is it normal to get that? or I am doing something wrong?
[01:19:29] Completed 0 out of 250000 steps (0%)
[01:23:21] Writing local files
[01:23:21] Completed 2500 out of 250000 steps (1%)
so my tpf is 3 min 52s. credit is 69 PPD. is there something wrong in here? |
It's not unusual for new SMP installs to pick up a unicore wu to start with, that what it looks like happened to you.
It should pick a SMP wu right after that one.
And like Mr. Boggs said the first frames tpf don't mean much...