View Single Post
  #19 (permalink)  
Old July 2, 2007, 07:37 AM
3.0charlie's Avatar
3.0charlie 3.0charlie is offline
3.0 "I kill SR2's" Charlie
Join Date: May 2007
Location: Laval, QC
Posts: 9,738

My System Specs


7/16" OD tube on 1/2" ID barbs is tight. Very tight - but feasible. Heat the ends, and be ready to put some weight to properly make the connection. Once started, don't stop pushing until the tube reaches the end of the barb fitting. Then install the clamp.

And don't forget to check the barbs before installing the tubes - once the tube is installed, it's too late to torque the barb again if it leaks.

Reply With Quote