View Single Post
  #16 (permalink)  
Old January 29, 2007, 08:01 PM
sizerkozak's Avatar
sizerkozak sizerkozak is offline
Top Prospect
 
Join Date: Dec 2006
Location: Oshawa Ontario
Posts: 87
Default

Im still workin away on this guys...im using the laptop right now as my main machine is still not up and running.

I have the waterblock and insulation all done and mounted...tommorow i will add the coolant and fire it up....took me all weekend to get the motherboard,lines and waterblock properly insulated so i can bring it down to -20 if needed. Pump is installed and i added a overload breaker to the system.

hang tight ...final pics only a day away !!
__________________
QX6700
ASUS P5N32-E SLI
BFG 8800 GTX
OCZ DC 2048MB PC8500 1066MHz DDR2 SLI
RaptorX 150GB 10K RPM
Three LGL1919S & 3HeadToGo
BFG 1000w
-20C Liquid Chiller
Rig Pics and Stats
Water chiller project
Monitor mod
Reply With Quote